Heavy Highway and Bridge Construction

Design/Build

SPS has quickly become a leader in the Design Build arena, having completed 2 design build projects, including the first design build project ever awarded by MassDOT in Grafton, MA, as well as the first MassDOT “heavy lift” design build project in Phillipston, MA which included the removal and replacement of the entire bridge superstructure on mainline Route 2 in less than 6 days. Currently, SPS has 4 additional active design build projects with MassDOT, ranging in scope from construction of a new interchange on Route 24 in Fall River to raising the clearance of 7 bridges over the railroad to accommodate double stacked commuter trains, to demolition of the existing Hanger and construction of 1 mile of roadway at the South Weymouth Naval Air Station.