Heavy Highway and Bridge Construction

Design/Build

Construction of the Route 24 Exit 8B Interchange, Fall River/Freetown, MA

SPS is in the final stages of this new interchange which will provide direct access from Route 24 into the Fall River Industrial Park. This project consists of construction of a 100 foot wide 2 span bridge over Route 24 and associated on an off ramps, construction of Executive Park Drive which connects Route 24 to the Industrial Park, reconfiguration of South Main Street to accommodate the new interchange, and construction of a wildlife crossing beneath Route 24. This 3 year project will be completed and opened to traffic in late 2011, 1 full year ahead of schedule.