Bridge Construction on Providence Highway over High and Harris Streets
Dedham, MA
This project, in the heart of Downtown Dedham, replaced 2 single span bridges with an at grade fill section between them with a 3 span structure consisting of a post-tensioned precast concrete bulb tee and concrete deck superstructure. The new structure opened up the downtown business area between High and Harris Streets which had been completely cut off from each other. The downtown area was further enhanced with brick pavers, lighting, benches and stained concrete.
