Longfellow Bridge Rehabilitation
Boston, MA
SPS has been awarded the contract for the Phase 1 early action work on this landmark bridge over the Charles River spanning from Boston to Cambridge. The work includes cleaning and painting of the Arch Rib Girders, cleaning, repair and repointing of the granite block abutments and piers including the “salt and pepper shaker” main span piers, installation of a consolidated 50 conduit duct bank, demolition of the existing utility ductbanks below the MBTA Red Line tracks, and several other items of work.
