SPS specializes in all types of bridge construction, from simple span bridges over land to moveable span bridges over deep water.
SPS is a leader in the Massachusetts Design Build Arena, having successfully completed 2 design build projects, with 4 active projects in various stages of construction.
SPS now operates out of a high quality marine terminal on the Island End River in Everett, MA with a deep water port link direct to Boston Harbor.
SPS New England’s “Heavy Lift” Design Build project in Phillipston, MA has been chosen as one of the top ten projects in the country by the American Association of State Highway and Transportation Officials (AASHTO) as part of the 2011 American Transportation Awards competition.
SPS is honored to be recognized for its work using accelerated and innovative construction techniques. For more information on this ground breaking project, Click Here.

On November 18, 2011, both Route 2 Eastbound and Westbound traffic was successfully shifted into the projects Phase 2 configuration. This milestone, was part of the of the $11 Million Dollar, twin bridge replacement project on Route 2 over Route 140 and the result of SPS’s innovation and a Value Engineering Change Proposal (VECP) that reduced the project duration by one entire year. This was accomplished by redesigning one of the two bridge structures to eliminate an entire phase of bridge work and a large portion of temporary roadway.
SPS New England’s “Heavy Lift” Design Build project in Phillipston, MA has been chosen as one of the top ten projects in the country by the American Association of State Highway and Transportation Officials (AASHTO) as part of the 2011 American Transportation Awards competition.
SPS has been recognized by MassDOT in the Accelerated Bridge Program September 2011 Update Report for two notable achievements;