News

Final Beam for Route 495 Haverhill Bridge

Big Day in Haverhill as Casco Bay delivers the final beam for the Route 495 Bridge Replacement over the Merrimack River. Incredible coordination and professionalism from Casco to deliver 6 Million pounds of steel beams, totaling close to 10,000 LF to the Haverhill site! Special thanks to Casco Bay Steel Structures, Inc. and Atlantic Bridge & Engineering for their dedicated work on this impressive project.

View Project

    • SPS new england, inc.  |  
    • 98 elm street   |  
    • salisbury, MA 01952   |  
    • (978) 462-6543     
  • © 2021 SPS New England, Inc. All Rights Reserved. | Website developed by Siphon Marketing